A BESS sizing strategy for primary frequency regulation support of solar photovoltaic plants
ABSTRACT: This paper proposes a strategy for sizing a battery energy storage system (BESS) that supports primary frequency regulation (PFR) service of solar photo-voltaic plants. The strategy is composed of an optimization model and a performance assessment algorithm. The optimization model includes...
- Autores:
-
Mejía Giraldo, Diego
Velásquez Gómez, Gregorio
Muñoz Galeano, Nicolás
Cano Quintero, Juan Bernardo
Lemos Cano, Santiago
- Tipo de recurso:
- Article of investigation
- Fecha de publicación:
- 2019
- Institución:
- Universidad de Antioquia
- Repositorio:
- Repositorio UdeA
- Idioma:
- eng
- OAI Identifier:
- oai:bibliotecadigital.udea.edu.co:10495/22568
- Acceso en línea:
- http://hdl.handle.net/10495/22568
- Palabra clave:
- Almacenamiento de energía
Energy storage
Baterias solares
Solar batteries
Sistemas de energía fotovoltaica
Photovoltaic power systems
Sistemas de baterías de reserva
- Rights
- openAccess
- License
- https://creativecommons.org/licenses/by/4.0/
