Experimental investigation of the performance of 6 kW BIPV system applied in laboratory building
This paper describes the operational performance results of 6 kW grid-connected building integrated photovoltaic system (BIPV) applied in laboratory building, installed in Colombia (in Bogotá, at 4°35’ latitude and 2.580m altitude) after one year of monitoring (September 2015-August 2016). The BIPV...
- Autores:
 
- Tipo de recurso:
 
- Fecha de publicación:
 - 2017
 
- Institución:
 - Universidad de Bogotá Jorge Tadeo Lozano
 
- Repositorio:
 - Expeditio: repositorio UTadeo
 
- Idioma:
 - OAI Identifier:
 - oai:expeditiorepositorio.utadeo.edu.co:20.500.12010/9113
 - Acceso en línea:
 -           http://dx.doi.org/doi:10.1016/j.enbuild.2017.07.030
          
http://hdl.handle.net/20.500.12010/9113
 - Palabra clave:
 -           BIPV system          
Distributed energy
PV performance
Monitoring
Efficiency
Generadores de energía fotovoltaica
Conversión directa de energía
 - Rights
 - License
 - Abierto (Texto Completo)
 
