Tunnelling in urban areas by epb machines: technical evaluation of the system

The paper refers to the methods adopted for building a high-speed railway tunnel system between Bologna and Firenze (Italy), focusing attention on the Bologna node which represents the heart of the system, connecting the high speed network's main lines. The project includes 9 tunnels, accountin...

Full description

Autores:
Cardu, Marilena
Oreste, Pierpaolo
Tipo de recurso:
Article of journal
Fecha de publicación:
2011
Institución:
Universidad Nacional de Colombia
Repositorio:
Universidad Nacional de Colombia
Idioma:
spa
OAI Identifier:
oai:repositorio.unal.edu.co:unal/39097
Acceso en línea:
https://repositorio.unal.edu.co/handle/unal/39097
http://bdigital.unal.edu.co/29194/
http://bdigital.unal.edu.co/29194/2/
Palabra clave:
Rights
openAccess
License
Atribución-NoComercial 4.0 Internacional
Description
Summary:The paper refers to the methods adopted for building a high-speed railway tunnel system between Bologna and Firenze (Italy), focusing attention on the Bologna node which represents the heart of the system, connecting the high speed network's main lines. The project includes 9 tunnels, accounting for 73 km of the 78 km route crossing below the Apennines. The paper pays attention to the main aspects to be taken into consideration for correctly choosing the tunnel boring machinery (TBM) tobe used in urban areas. Thefundamental point in analysing technical aspects regarding an earth pressure balance (EPB) machine concerned storing the main excavation parameter values; having collected and organised such data, statistical methods were used for processing it, the instantaneous velocities attained were empirically estimated and idle times were evaluated. The evaluation was made by calculating excavation specific energies (during differentexcavation phases) to find a satisfactory correlation with the type of ground crossed. Interesting results have been found by comparison with other excavation parameters; in particular, a better understanding of an earth pressure balance shield's working phases has been reached thanks to an experimental study conducted during the construction of tunnels for a high-speed railway system in Italy. The paper contains details collected regarding the operation of two different EPB machines.