Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes

The development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenan...

Full description

Autores:
Tipo de recurso:
Fecha de publicación:
2020
Institución:
Universidad Católica de Pereira
Repositorio:
Repositorio Institucional - RIBUC
Idioma:
spa
OAI Identifier:
oai:repositorio.ucp.edu.co:10785/10019
Acceso en línea:
https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793
http://hdl.handle.net/10785/10019
Palabra clave:
Rights
openAccess
License
Derechos de autor 2020 Entre Ciencia e Ingeniería
id RepoRIBUC_210fb5048caba5210561d5f5d74d8723
oai_identifier_str oai:repositorio.ucp.edu.co:10785/10019
network_acronym_str RepoRIBUC
network_name_str Repositorio Institucional - RIBUC
repository_id_str
spelling Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processesDiseño de una metodología para generar un plan de mantenimiento a través de la integración de RCM, WCM y Lean Manufacturing aplicable en procesos de trefilado de alambrónThe development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenance plan applicable in wire drawing processes, particularly in a Mexican company in the steel sector. In the "Empathize, Define and Devise" phases, the main problems in processes of the steel sector of Colombian companies and one in Mexico are identified, proposing solution alternatives based on needs and realities, considering the expected Key Performance Indicators (KPI). Subsequently, tools are selected according to the problem and the alternative solutions proposed. In the "Prototype and Evaluate" phases, the selected tools are integrated, generating a maintenance plan which is described and represented by a diagram as an evaluation of the designed methodology.Se presenta el desarrollo de cinco fases basadas en el Design Thinking (Empatizar, Definir, Idear, Prototipar, Evaluar) con el propósito de diseñar una metodología integrando herramientas de Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) y Lean Manufacturing, la cual permita generar un plan de mantenimiento aplicable en procesos de trefilado de alambrón particularmente en una empresa mexicana del sector del acero. En las fases “Empatizar, Definir e Idear”, se identifican los problemas principales en procesos del sector del acero de empresas colombianas y una en México, planteando alternativas de solución basadas en las necesidades y realidades, considerando los Key Perfomance Indicators (KPI) esperados. Posteriormente se seleccionan herramientas acordes al problema y a las alternativas de solución planteadas. En las fases “Prototipar y Evaluar”, se integran las herramientas seleccionadas generando un plan de mantenimiento el cual es descrito y representado por un diagrama como evaluación de la metodología diseñada.Universidad Católica de Pereira2022-06-01T19:09:05Z2022-06-01T19:09:05Z2020-07-19Artículo de revistahttp://purl.org/coar/resource_type/c_6501http://purl.org/coar/version/c_970fb48d4fbd8a85info:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionhttp://purl.org/coar/resource_type/c_2df8fbb1application/pdfhttps://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/179310.31908/19098367.1793http://hdl.handle.net/10785/10019Entre ciencia e ingeniería; Vol 14 No 27 (2020); 82-90Entre Ciencia e Ingeniería; Vol. 14 Núm. 27 (2020); 82-90Entre ciencia e ingeniería; v. 14 n. 27 (2020); 82-902539-41691909-8367spahttps://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793/1702Derechos de autor 2020 Entre Ciencia e Ingenieríahttps://creativecommons.org/licenses/by-nc/4.0/deed.es_EShttps://creativecommons.org/licenses/by-nc/4.0/deed.es_ESinfo:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Pérez Adán, EmilioCastiblanco-Jiménez, IvonneMateo Díaz, Nicolás Franciscooai:repositorio.ucp.edu.co:10785/100192025-01-27T23:59:43Z
dc.title.none.fl_str_mv Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
Diseño de una metodología para generar un plan de mantenimiento a través de la integración de RCM, WCM y Lean Manufacturing aplicable en procesos de trefilado de alambrón
title Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
spellingShingle Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
title_short Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
title_full Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
title_fullStr Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
title_full_unstemmed Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
title_sort Design of a methodology to generate a maintenance plan through the integration of RCM, WCM and Lean Manufacturing in wire drawing processes
description The development of five phases based on Design Thinking (Empathize, Define, Ideate, Prototype, Evaluate) is presented in order to design a methodology integrating Reliability Centered Maintenance (RCM), World Class Manufacturing (WCM) and Lean Manufacturing tools, which allows generating a maintenance plan applicable in wire drawing processes, particularly in a Mexican company in the steel sector. In the "Empathize, Define and Devise" phases, the main problems in processes of the steel sector of Colombian companies and one in Mexico are identified, proposing solution alternatives based on needs and realities, considering the expected Key Performance Indicators (KPI). Subsequently, tools are selected according to the problem and the alternative solutions proposed. In the "Prototype and Evaluate" phases, the selected tools are integrated, generating a maintenance plan which is described and represented by a diagram as an evaluation of the designed methodology.
publishDate 2020
dc.date.none.fl_str_mv 2020-07-19
2022-06-01T19:09:05Z
2022-06-01T19:09:05Z
dc.type.none.fl_str_mv Artículo de revista
http://purl.org/coar/resource_type/c_6501
http://purl.org/coar/version/c_970fb48d4fbd8a85
info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
dc.type.coar.fl_str_mv http://purl.org/coar/resource_type/c_2df8fbb1
status_str publishedVersion
dc.identifier.none.fl_str_mv https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793
10.31908/19098367.1793
http://hdl.handle.net/10785/10019
url https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793
http://hdl.handle.net/10785/10019
identifier_str_mv 10.31908/19098367.1793
dc.language.none.fl_str_mv spa
language spa
dc.relation.none.fl_str_mv https://revistas.ucp.edu.co/index.php/entrecienciaeingenieria/article/view/1793/1702
dc.rights.none.fl_str_mv Derechos de autor 2020 Entre Ciencia e Ingeniería
https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES
https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES
info:eu-repo/semantics/openAccess
http://purl.org/coar/access_right/c_abf2
rights_invalid_str_mv Derechos de autor 2020 Entre Ciencia e Ingeniería
https://creativecommons.org/licenses/by-nc/4.0/deed.es_ES
http://purl.org/coar/access_right/c_abf2
eu_rights_str_mv openAccess
dc.format.none.fl_str_mv application/pdf
dc.publisher.none.fl_str_mv Universidad Católica de Pereira
publisher.none.fl_str_mv Universidad Católica de Pereira
dc.source.none.fl_str_mv Entre ciencia e ingeniería; Vol 14 No 27 (2020); 82-90
Entre Ciencia e Ingeniería; Vol. 14 Núm. 27 (2020); 82-90
Entre ciencia e ingeniería; v. 14 n. 27 (2020); 82-90
2539-4169
1909-8367
institution Universidad Católica de Pereira
repository.name.fl_str_mv
repository.mail.fl_str_mv
_version_ 1844494709603434496